Normally I take the video with automatic scene detection on my Coputer. When the material in an hour to get to 130 easily clips. And now the problems begin. When I see the clips on a slip from the project window into the editing window, accept, they will not be the natural host sequence sorted. When capturing, the clips you know the names of continuously:
Untitled Clip 01 01 01 Untitled Clip 01 01 02 etc. on the clip 01 01 10 but this is not the clip 01 01 11 but the clips 01 01 100 and 01-01 101, etc. Thus, the confusion is complete. How behelft you in such a case? I just go once all the clips from the project window and removed a batch renaming conducted in the manner 001.avi, 002.avi, etc. and then re-performed. Premiere has now sorted correctly. What a fact! (The sort of small in view of clip clip is totally unacceptable)
Antwort von Andreas_Kiel:
If it is not there a different naming scheme set? In HDVSplit for example, the default name: xxxxxxx_2008_02_06_13_45_30 xxxxx ie text, date and time in sortable sequence. Then during the capture. Get somewhere, perhaps the last counter in your program in four digits, with "leading zero"? BG, Andreas